Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2022-03-02 13:44
85
Company Profile
Shanghai Ever International Corp., LtdBy certification [File Integrity]
Contact:everintl2(Mr.)
Email:
Telephone:
Phone:
Area:Beijing
Address:Beijing
Website:http://www.hydgetlighting.com/ http://everintl2.adn-cn.com/
Product Introductions:
Model | |
Materials | 304 Stainless steel+aluminum |
Power | 3W |
LED Chip | CREE-XBD LED |
Lumens | 220LM |
CRI | >80Ra |
Beam angle | 15° 45° 60° |
Voltage | DC12-24V |
Color | 3000K,4000K,6000K |
Others | Red,Green,Blue |
Size | 45XH50mm |
IP Rate | IP68 |
Warranty | 3 Years |
Low voltage power supply is safe to use
DC12V input, to avoid the risk of electric shock
Brushed black lens design
Anti-glare tempered glass, resistant to 500KG pressure
IP 68 Waterproof Rating
made of high quality IP 68 material, this light is rain-proof waterproof and can be submersible, you can install this light underwater of you pond.
5-layer waterproof internal structure
Protection class IP68, can be installed in outdoor environment, resistant to rain and sunlight, can be installed in 1 meter underwater use
Features:
1.Tempered glass
2.PMMA material optical lens (93% light transmission)
3.Original American CREE brand LED
4.304 stainless steel face ring
5.204 stainless steel clamps
6.Radiator
7.Waterproof nut
8.High temperature resistant wire
9.Waterproof terminal
Product packaging:
1 light/box
Weight: 0.13KG
180 boxes/carton
Weight per carton: 28KG
Carton size: 47*47*30cm
INSTALLATION
Wiring method 1
Pre-wire laying (low-voltage end divided into positive and negative wiring)
1.Cut off the waterproof terminal of the lamp
2.Connect the lights in parallel to the pre-arranged main wire
3.After the main wire is connected to the constant voltage power supply/transformer, then connected to 110V/220V
Wiring method 2
1. Pre-wire laying (low-voltage end divided into positive and negative wiring)
2. Cut off the waterproof terminal of the lamp(Male end)
3. The extension wire is connected in parallel to the pre laid main wire
4. The male end of the waterproof terminal of the lamp is connected with the female end of the extension wire
5. After the main wire is connected to the constant voltage power supply/transformer, then connected to 110V/220V
Wiring method 3
The diversion and extension wire is 0.3 square wire.
1W lamp, it is recommended to connect up to 20 lamps per group
3W lamp, each group is recommended to connect up to 8 lamps per group
Installation method 1: direct opening installation
Wooden board, gypsum board, marble or already done wall, etc., you can directly open the hole to install, as follows
Installation method 2: Installation with embedded parts
Installed with pre-buried parts, generally applied to concrete, lawn, etc. to facilitate fixed lights, as follows:
http://www.hydgetlighting.com/